The system of certification is applied for 200 operators of Cantarell. There are defined projects of WBT and dynamic simulators. A contract is granted to Invensys to intervene in systems ABB. It was developed the first System of Critical Control for Turbocompressors and Ovens with Trident equipment. SIL verification in KUMAZA at Alpha, Gulf and Zaap-C platforms.
2006
Simulator development is added to our plan of training. ISA MÉXICO'S Safety committee is defined and the users' first meeting is established. Critical and no critical communications are realized with Triplex. ARPO intervenes in a project of ESD, F&G and SDMC systems with Siemens, Moore and ABB equipments.
2005
Maintenance projects to safety systems are initiated. A training system for operator certification is defined. The first Critical Control System based on TMR is installed in Minera Mexico. Is carried out a SIL verification in IPC 62 project.
2004
Works to third parties for Emergency Shutdown Systems are initiated in EPC 2 and EPC 3. Diverse works are carried out in not Invensys systems with Diavaz and Dragados.
2003
SIL verification for IPC 59 project at Delta, Indian, Focus and Oscar platforms. Homologation problems begins and common criteria are defined in Cantarell. It was concreted the NFR 45 for PEMEX. The first simulator is proposed for a system commissioning at AKAL-C.
2002
ARPO initiates with the development of complete projects and as a group of Emergency Shutdown, Gas & Fire and SDMC. ARPO initiates with the combustible Gas systems execution. Invensys-Demar partial tests panels are defined and it was installed more than 600. Installation and commissioning of the first Italian SCADA in Mexico.
2001
ARPO initiates with star-to-end projects execution of Gas & Fire and Emergency Shutdown Systems. ARPO carried out hazard analysis with Check List technique for 5 motogenerators at peripheral platforms.
2000
ARPO initiates HAZOP with 11 gas sweetening plant. ARPO participates actively in the ISA-USES 84.01 committee. ARPO participates in the definition of PEMEX NFR-45 norm for Safety Instrumented Systems. ARPO initiates DP and Profibus PA communication Networks project with SIEMENS equipment.
1999
ARPO specifies and adds MMI for ESD and control and information Network for complex coordinated shutdown. SCADA projects are initiated for electrical substations for ABB Company. The request of partial tests panel in the offshore systems is established.
1998
Emergency Shutdown and Gas and Fire Systems with Triconex equipment and engineering under the norm ISA 84.01 projects are initiated.
1997
Control Systems with Rowkwell Automation equipment and Wonderware Interface projects are initiated.
1996
1995
1994
1993
ARPO develops in the area of training with courses and seminars in Automation and Processes.